STEVE'S WORK PICTURES
STEVE'S PHOTO GALLERY
JUST A FEW PHOTOGRAPHS TO GIVE YOU AN IDEA OF SOME OF THE TYPES OF JOBS WE DO.
ANOTHER HARMONIOUS POUR!
QUITE A REACH WITH THAT JOINTER
POURING FOUNDATION FOR ST ANTHONY SIGN
C'MON STEVE PULL THAT CRETE!!
ST ANTHONY SIGN COMPLETE
DID I MENTION STEVES LABOR FOR THAT SIGN WAS DONATED?
LAYING BLOCK AT ST ANTHONYS
LOOKS LEVEL PLUMB AND SQUARE TO ME!!
CULVERT ENDS
TYPICAL CULVERT END CONFIGURATION
NOCTURNAL FINISHING
THE CONCRETE TELLS US WHEN TO GO HOME!!!
A VIEW OF A FINISHED DRIVEWAY
NOTICE THE WELL PROPORTIONED JOINTS
ALMOST TOO PRETTY TO DRIVE ON!!
NOTICE THE ELEVATION OF THE DRIVEWAY.WE SET THE GRADE TO GIVE YOU THE SMOOTHEST RIDE POSSIBLE
POURING FOUNDATION FOR SIGN
THE GRADE ON THIS JOB WAS MINIMUM FOR WATER FLOWAGE
STRIP THOSE FORMS
ANOTHER ELEVATED DRIVEWAY
PICTURE FRAMED CURVED JOINTS ON A 1OO YARD DRIVEWAY
WE EVEN USE 6 BAG MIX WITH FIBERS IN FOUNDATIONS!
FLOATING GARAGE SLAB
FIRST WE HIT IT WITH A FRESNO
CONCRETE SETTING UP
THATS ALOT OF PRESSURE TO HOLD BACK.BRACE PLACEMENT IS IMPORTANT